Saturday, January 16, 2010

Pakistan Railways




Pakistan Railways (reporting mark PR) is a national state-owned rail transport service of Pakistan, head-quartered in Lahore. It is administered by the federal government under the Ministry of Railways. PR provides an important mode of transportation throughout Pakistan. It is commonly referred to as the "life line of the country", by aiding in large scale movement of people and freight throughout Pakistan. The current chairman is Sami-ul-Haq Khilji.[1]
Contents[hide]
1 History
2 Major Routes
2.1 Domestic
2.2 Major Stations and Junctions
2.3 Proposed
2.4 International
3 Traffic
3.1 Passenger
3.2 Freight
4 Pakistan Locomotive Factory, Risalpur
5 Gauge
6 Accidents
7 Future Developments
7.1 New Lines
7.2 Electrification
7.3 High-Speed Rail
7.4 International Lines
8 China-Pakistan Links
9 See also
10 References
11 External links
//
[edit] History
Main article: History of rail transport in Pakistan

Extent of the Railway network in 1909
The idea of a rail network was first thought of in 1847, with the possibility of Karachi becoming a major seaport. Sir Henry Edward Frere, who was appointed as the Commissioner of Sindh, sought permission from Lord Dalhousie to begin a survey for a Karachi Seaport and a survey for a railway line in 1858. The proposed railway line would be laid from Karachi (city) to Kotri. A steamboat service on the Indus and Chenab rivers would connect Kotri to Multan and from there another railway line would be laid to Lahore and beyond.
On May 13th, 1861 the first railway line was opened to the public, between Karachi (city) and Kotri, with a total distance of 105 miles (169 km).
By 1886, there were four railway companies operating in what would become Pakistan. The Scinde (Sindh) Railways, Indian Flotilla Company, Punjab Railway and Delhi Railways. These were amalgamated into the Scinde, Punjab & Delhi Railways Company and purchased by the Secretary of State for India in 1885, and in January 1886 formed the North Western State Railways, which was later on renamed as North Western Railway (NWR). This would eventually become Pakistan Railways in 1947.
Another railway line between Karachi and Keamari was opened on June 16th, 1889. In 1897, the line from Keamari to Kotri was doubled.
By 1898 as the network began to grow, another proposed railway line was in the works from Peshawar to Karachi. It closely followed the route taken by Alexander The Great and his army while marching through the Hindu Kush to the Arabian Sea. During the early 20th century, railway lines were also laid down between Peshawar and Rawalpindi and Rawalpindi to Lahore. Different sections on the existing main line from Peshawar and branch lines were constructed in the last quarter of 19th century and early 20th century.
In 1947, after Pakistan became an independent state, 1,947 route miles (3,133 km) of North Western Railways were transferred to Pakistan from British India.
In 1954, the railway line was extended to Mardan and Charsada, and in 1956 the Jacobabad-Kashmore 2 ft 6 in (762 mm) gauge line was converted into broad gauge. In 1961, the Pakistani portion of North Western Railways was renamed Pakistan Railways. The Kot Adu-Kashmore line was constructed between 1969 and 1973 providing an alternative route from Karachi to northern Pakistan.

No comments:

Post a Comment